Show on map
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Other infrastructure
Th Street - Northeast 230 kV: route and 3 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Th Street - Northeast 230 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-FL
- Owner (as stated)
- Duke Energy Florida
Details
Who’s behind it
- Owner
- Duke Energy Florida
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 8
- Substations at the ends (as the source names them)
- Th Street to Northeast
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | duke energy florida |
| HIFLD line ID | 131165 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| South Tampa Energy Storage Postponed | Storage | 8.9 mi | 20 |
| H L Culbreath Bayside Power Station Postponed | Gas, combustion turbine | 14.8 mi | 503.8 |
| Tampa Electric Co NA 2 Postponed | Gas, combustion turbine | 14.8 mi | 982 |
Sources EIA-860M