Show on map
Thigpen Farms Solar, LLC — Power plant · Solar · Modal Power LLCCollard Holdings Solar — Postponed · Solar · NC · 10 MW · 5.5 mi awayIsland Grove Solar — Postponed · Solar · NC · 2 MW · 8.5 mi awayFriesian Holdings — Postponed · Solar · NC · 75 MW · 10.9 mi awayScotch Grove Solar — Filed · Solar · NC · 80 MW · 11.1 mi awayRhubarb One — Postponed · Solar · NC · 5 MW · 13.0 mi awayInnovative Solar 53 — Postponed · Solar · NC · 40 MW · 13.8 mi awayHilly Branch — Postponed · Solar · NC · 2 MW · 14.5 mi away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Thigpen Farms Solar, LLC

Power plant · Solar

Key facts

Power plant · Solarran 24% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Net generation, 2025
10,405 MWh
Grid
23 kV to Duke Energy Progress - (NC) (DUK)
Location
Robeson County, North Carolina
Operated by
Modal Power LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2023 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
3 years since 2023
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000818164
Location id
L100000815303
Eia plant ids
60850
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
22.90
Transmission owner
Duke Energy Progress - (NC)
Balancing authority code
DUK
Balancing authority name
Duke Energy Carolinas
Fuel burned (MMBtu), 202535,503
Capacity factor, 20250.238
Net generation (MWh), 202510,405
Balancing authority codeDUK

Solar array

Array area (acres)
34.8
AC capacity (MW)
5
DC capacity (MW)
7.5
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2023

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Collard Holdings Solar Postponed Solar 5.5 mi 10
Island Grove Solar Postponed Solar 8.5 mi 2
Friesian Holdings Postponed Solar 10.9 mi 75
Scotch Grove Solar Filed Solar 11.1 mi 80
Rhubarb One Postponed Solar 13.0 mi 5
Innovative Solar 53 Postponed Solar 13.8 mi 40
Hilly Branch Postponed Solar 14.5 mi 2

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution