Show on map
Thunder Wolf Energy Center Hybrid — Power plant · Solar · Thunder Wolf Energy Center, LLCStagecoach LRE — Permitted · Solar · CO · 230 MW · 5.7 mi awayArroyo Solar — Under construction · Solar · CO · 335 MW · 8.4 mi awayWaxwing Solar CSG — Under construction · Solar · CO · 3 MW · 11.2 mi awayPueblo Airport Generating Station — Studied · Storage · CO · 50 MW · 11.4 mi awayPueblo Airport Generating Station — Postponed · Gas, combustion turbine · CO · 100 MW · 11.4 mi awayMirasol Energy Center, LLC. — Permitted · Solar · CO · 400 MW · 11.9 mi awayVestas Towers America, Inc. — Postponed · Wind · CO · 3 MW · 12.1 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Thunder Wolf Energy Center Hybrid

Power plant · Solar

Key facts

Power plant · Solarran 18% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Net generation, 2025
543,742 MWh
Grid
23 kV to Public Service Co of Colorado (PSCO)
Location
Pueblo County, Colorado
Operated by
Thunder Wolf Energy Center, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2023 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
3 years since 2023
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000806011
Location id
L100000805205
Eia plant ids
63776
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
23
Transmission owner
Public Service Co of Colorado
Balancing authority code
PSCO
Balancing authority name
Public Service Company of Colorado
Fuel burned (MMBtu), 20251,910,921
Capacity factor, 20250.178
Net generation (MWh), 2025543,742
Balancing authority codePSCO

Solar arrays

Array area (acres)
1,290.8
AC capacity (MW)
248
DC capacity (MW)
248
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2022

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Stagecoach LRE Permitted Solar 5.7 mi 230
Arroyo Solar Under construction Solar 8.4 mi 335
Waxwing Solar CSG Under construction Solar 11.2 mi 3
Pueblo Airport Generating Station × 2 units Studied Storage 11.4 mi 150
Mirasol Energy Center, LLC. Permitted Solar 11.9 mi 400
Vestas Towers America, Inc. Postponed Wind 12.1 mi 3

Sources EIA-860M · Berkeley Lab

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.

Attribution