Timberline Trail Gas Recovery
Power plant · Biomass
Key facts
Power plant · Biomassran 68% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2006
- Net generation, 2025
- 19,141 MWh
- Grid
- 12 kV to Dairyland Power Coop (MISO)
- Location
- Rusk County, Wisconsin
- Operated by
- WM Renewable Energy LLC
Output
- Biomass and waste
Details
Who’s behind it
- Owner
- Waste Management Inc
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Biomass source: “Landfill Gas”
- Age
- 20 years since 2006
- Heat rate
- 12,608 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 241,322 |
| Capacity factor, 2025 | 0.683 |
| Heat rate (Btu/kWh), 2025 | 12,607.6 |
| Net generation (MWh), 2025 | 19,141 |
| Balancing authority code | MISO |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 2.4 MW
- Generators retired
- 3
- Capacity still in service
- 3.2 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN6 | Landfill Gas | 0.8 MW | Retired | October 2011 |
| GEN7 | Landfill Gas | 0.8 MW | Retired | October 2011 |
| GEN1 | Landfill Gas | 0.8 MW | Retired | November 2014 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 12 kV
- Transmission or distribution system owner
- Dairyland Power Coop
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- MRO
Transmission lines within 15 mi (2)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| WM Renewable Energy LLC | Operator | EIA-860M | ||
| WASTE MANAGEMENT INC | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Unit GEN1 scheduled to retire, 0.8 MW · EIA-860M
- Stated Units GEN6, GEN7 scheduled to retire, 1.6 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)