- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Tok: location and 1 exact-grade project within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Power plant · Oil
Key facts
Power plant · Oilran 16% of 2025 Out of service- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1989
- Net generation, 2025
- 11,531 MWh
- Grid
- 15 kV to Alaska Power and Telephone Co
- Location
- Southeast Fairbanks County, Alaska
- Operated by
- Alaska Power and Telephone CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 37 years since 1989
- Heat rate
- 9,191 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 105,985 |
| Capacity factor, 2025 | 0.161 |
| Heat rate (Btu/kWh), 2025 | 9,191.3 |
| Net generation (MWh), 2025 | 11,531 |
Retirement
- Capacity retired
- 1.3 MW
- Generators retired
- 2
- Capacity still in service
- 8.2 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 9 | Petroleum Liquids | 0.9 MW | Retired | September 2008 |
| 8 | Petroleum Liquids | 0.4 MW | Retired | January 2017 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 15 kV
- Transmission or distribution system owner
- Alaska Power and Telephone Co
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 8 scheduled to retire, 0.4 MW · EIA-860M
- Stated Unit 9 scheduled to retire, 0.9 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| 7-Mile Ridge Wind Project Postponed | Wind | 18.6 km | 1.8 |