Show on map
Torrington — Power plant · Oil · Connecticut Jet Power LLC
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1967
Net generation, 2025
277 MWh
Grid
115 kV to Connecticut Light & Power Co (ISNE)
Location
Litchfield County, Connecticut
Operated by
Connecticut Jet Power LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2025
277MWh
Fuel burned, 2025
3,914MMBtu
Capacity factor, 2025
0.1%
Heat rate, 2025
14,130Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
20252773,9140.1%14,130
20241462,1050.1%14,418
2023679570.0%14,284
20221823,1980.1%17,571
20211542,7920.1%18,130
20201645,6920.1%—
2019951,5350.1%16,158
20183475,4550.2%15,720
20174984,9370.3%9,914
20161482,3010.1%15,547
20152673,6440.1%13,648
20146078,3750.3%13,797
20133815,4670.2%14,349
20123374,8760.2%14,469
20112323,4000.1%14,655
20106229,3220.3%14,987
20094846,9050.2%14,266
20084315,9590.2%13,826
200770210,1420.4%14,447
20061482,1210.1%14,331
20051,0437,0710.5%6,780
20042843,9730.1%13,990
20031342,3580.1%17,563
20023294,6620.2%14,170
200100——
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Every source and license · Attribution

View at source