Show on map
Townsite Solar Project Hybrid — Power plant · Solar · Townsite Solar, LLCBoulder Flats Solar — Under construction · Solar · NV · 113 MW · 6.9 mi awayBoulder Solar III LLC — Announced · Solar + storage · NV · 256 MW · 8.2 mi awayJASMINE DEVELOPMENT, LLC — Built · Large load · NV · 9.3 mi awayRoccasecca BESS LLC — Under construction · Storage · NV · 126.6 MW · 10.3 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Townsite Solar Project Hybrid

Power plant · Solar

Key facts

Power plant · Solarran 20% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
465,922 MWh
Grid
230 kV to WAPA-- Western Area Power Administration (WALC)
Location
Clark County, Nevada
Operated by
Townsite Solar, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
5 years since 2021
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000805479
Location id
L100000804754
Eia plant ids
60654
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
230
Transmission owner
WAPA-- Western Area Power Administration
Balancing authority code
WALC
Balancing authority name
Western Area Power Administration - Desert Southwest Region
Fuel burned (MMBtu), 20251,640,117
Capacity factor, 20250.197
Net generation (MWh), 2025465,922
Balancing authority codeWALC

Solar arrays

Array area (acres)
856.5
AC capacity (MW)
160
DC capacity (MW)
180
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2021

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Boulder Flats Solar Under construction Solar 6.9 mi 113
Boulder Solar III LLC Announced Solar + storage 8.2 mi 256
JASMINE DEVELOPMENT, LLC Built Large load 9.3 mi
Roccasecca BESS LLC Under construction Storage 10.3 mi 126.6

Sources EIA-860M · EPA ICIS-Air · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026
  • CAISOOpen license, with credit · retrieved Nov 16, 2026Source: California ISO

Attribution