Tracy 210 — Power plant · Gas, other · Costco WholesaleTESLA Power Project — Gas, combined cycle · CA · 1,322 MW · 3.2 km awayTracy BESS — Storage · CA · 40 MW · 3.8 km awayZeus BESS — Storage · CA · 200 MW · 3.9 km awayMulqueeney Wind Energy — Wind · CA · 80 MW · 5.8 km awaySand Hill B — Wind · CA · 17 MW · 6.9 km awaySand Hill A — Wind · CA · 13.5 MW · 7.2 km awaySand Hill C — Wind · CA · 80.8 MW · 7.8 km awayRooney Ranch — Wind · CA · 21 MW · 10.8 km awayTracy Renewable Power Plant — Biomass · CA · 5 MW · 10.8 km awayBuena Vista Energy LLC — Storage · CA · 100 MW · 15.1 km awayTres Vaqueros Wind Farms LLC — Wind · CA · 28.3 MW · 19.2 km awayAramis I Solar Project — Storage · CA · 100 MW · 20.9 km awayAramis I Solar Project — Solar · CA · 100 MW · 20.9 km away
  • Combustion
  • Wind & solar
  • Storage
  • Bioenergy
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, other

Key facts

Power plant · Gas, otherran 91% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2019
Net generation, 2025
20,617 MWh
Grid
12 kV to Pacific Gas & Electric Co. (CISO)
Location
San Joaquin County, California
Operated by
Costco WholesaleSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2019 to 2025
Fuel burned MMBtu by year, 2019 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, other source: “Other Natural Gas”
Age
7 years since 2019
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12
Transmission owner
Pacific Gas & Electric Co.
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20251,501,457
Capacity factor, 20250.905
Net generation (MWh), 202520,617
Balancing authority codeCISO
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 72826.2 outside 5000-30000 Btu/kWh

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
TESLA Power Project Postponed Gas, combined cycle 3.2 km 1,322
Tracy BESS Under construction Storage 3.8 km 40
Zeus BESS Contracted Storage 3.9 km 200
Mulqueeney Wind Energy Under construction Wind 5.8 km 80
Sand Hill B Filed Wind 6.9 km 17
Sand Hill A Filed Wind 7.2 km 13.5
Sand Hill C Contracted Wind 7.8 km 80.8
Rooney Ranch Filed Wind 10.8 km 21
Tracy Renewable Power Plant Under construction Biomass 10.8 km 5
Buena Vista Energy LLC Postponed Storage 15.1 km 100
Tres Vaqueros Wind Farms LLC Withdrawn Wind 19.2 km 28.3
Aramis I Solar Project × 2 units Under construction Storage 20.9 km 200

Sources EIA-860M · CAISO

Sources

Attribution