Show on map
- Wind & solar
- In development
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- In development
- Other infrastructure
TRANSMONTAIGNE OPERATING COMPANY, SELMA - N: location and 5 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Transmontaigne Operating Company, Selma - N
Petroleum product terminal
As filed: TRANSMONTAIGNE OPERATING COMPANY, SELMA - N
Key facts
Petroleum product terminal Operating- Location
- North Carolina
Details
Who’s behind it
- Owner
- Transmontaigne Operating CompanySourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Capacity not stated
All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
| Attribute | Value |
|---|---|
| Padd | 1 |
| Site | SELMA - N |
| Survey | EIA-815 |
| Owner, as the source states it | TRANSMONTAIGNE OPERATING COMPANY |
| Source release | 202109 |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Terminals (as of September 2021)
- EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Maple Leaf Solar Permitted | Solar | 2.9 mi | 73 |
| Smithfield Solar LLC Postponed | Solar | 3.7 mi | 5 |
| Signature Solar Postponed | Solar | 8.9 mi | 5 |
| Longleaf Solar Postponed | Solar | 9.3 mi | 5 |
| Sadie Solar Postponed | Solar | 9.7 mi | 5 |
Sources EIA-860M