Show on map
Signature SolarSadie Solar — Postponed · Solar · NC · 5 MW · 1.2 mi awayLongleaf Solar — Postponed · Solar · NC · 5 MW · 2.7 mi awayStevens Mill Solar — Filed · Solar · NC · 80 MW · 8.6 mi awaySmithfield Solar LLC — Postponed · Solar · NC · 5 MW · 11.3 mi awayMaple Leaf Solar — Permitted · Solar · NC · 73 MW · 11.4 mi awayBradley Farm (Dudley) — Postponed · Solar · NC · 5 MW · 13.2 mi awayRoady Lane Farm LLC — Postponed · Solar · NC · 74.8 MW · 13.2 mi away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Signature Solar

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Interconnection queue
Duke Energy Carolinas (DUK)
Location
Johnston County, North Carolina

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
EIA plant
60155 generator PV1

Timeline

  • Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Sadie Solar Postponed Solar 1.2 mi 5
Longleaf Solar Postponed Solar 2.7 mi 5
Stevens Mill Solar Filed Solar 8.6 mi 80
Smithfield Solar LLC Postponed Solar 11.3 mi 5
Maple Leaf Solar Permitted Solar 11.4 mi 73
Bradley Farm (Dudley) Postponed Solar 13.2 mi 5
Roady Lane Farm LLC Postponed Solar 13.2 mi 74.8

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution