Trent Substation 138 kV line — Transmission lineHarvey Solar — Permitted · Solar · OH · 350 MW · 0.4 mi awaySTACK NAL01B (New Albany data centre) — Filed · Large load · OH · 10.8 mi awayCMH137 — Filed · Large load · OH · 10.8 mi awayCITI MIDWEST DATA CENTER — Built · Large load · OH · 11.4 mi awayBZI Crane (ECX CMH03) — Filed · Large load · OH · 11.4 mi awayCMH03 — Filed · Large load · OH · 11.5 mi awayVantage OH 12 — Filed · Large load · OH · 11.6 mi awayCMH082 CAMPUS — Built · Large load · OH · 11.7 mi awayFlint — Under construction · Storage · OH · 200 MW · 11.8 mi awayCyrusOne COL-1 — Filed · Large load · OH · 11.9 mi awaySouth Site Data Center Energy Center — Filed · Large load · OH · 12.1 mi awayCMH050 — Built · Large load · OH · 12.6 mi awayCOLOGIX — Built · Large load · OH · 13.4 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Trent Substation 138 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-OH
Owner (as stated)
Ohio Power

Details

Who’s behind it

Owner
Ohio Power

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
6
Substations at the ends (as the source names them)
Trent Substation
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itohio power
HIFLD line ID179933
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Harvey Solar Permitted Solar 0.4 mi 350
STACK NAL01B (New Albany data centre) Filed Large load 10.8 mi
CMH137 Filed Large load 10.8 mi
CITI MIDWEST DATA CENTER Built Large load 11.4 mi
BZI Crane (ECX CMH03) Filed Large load 11.4 mi
CMH03 Filed Large load 11.5 mi
Vantage OH 12 Filed Large load 11.6 mi
CMH082 CAMPUS Built Large load 11.7 mi
Flint Under construction Storage 11.8 mi 200
CyrusOne COL-1 Filed Large load 11.9 mi
South Site Data Center Energy Center Filed Large load 12.1 mi
CMH050 Built Large load 12.6 mi
COLOGIX Built Large load 13.4 mi

Sources EIA-860M · FAA OE/AAA · EPA ICIS-Air