Show on map
CMH137Vantage OH 12 — Filed · Large load · OH · 0.9 mi awayCMH082 CAMPUS — Built · Large load · OH · 1.0 mi awayFlint — Under construction · Storage · OH · 200 MW · 1.5 mi awayBZI Crane (ECX CMH03) — Filed · Large load · OH · 1.8 mi awayCMH050 — Built · Large load · OH · 1.9 mi awayCyrusOne COL-1 — Filed · Large load · OH · 2.1 mi awaySouth Site Data Center Energy Center — Filed · Large load · OH · 2.2 mi awayCMH03 — Filed · Large load · OH · 2.3 mi awaySTACK NAL01B (New Albany data centre) — Filed · Large load · OH · 2.7 mi awayUnion Ridge Solar — Under construction · Solar · OH · 108 MW · 10.6 mi awayHarvey Solar — Permitted · Solar · OH · 350 MW · 11.3 mi awayCOLOGIX — Built · Large load · OH · 13.2 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Data center

Kind
Data center
Location
Licking County, Ohio

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Data center source: “Data Center”
Capacity (MW)
Not stated

Timeline

  • Observed as filed in FAA OE/AAA (source status: “Determined - No Hazard”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources FAA OE/AAA

Sources

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Vantage OH 12 Filed Large load 0.9 mi
CMH082 CAMPUS Built Large load 1.0 mi
Flint Under construction Storage 1.5 mi 200
BZI Crane (ECX CMH03) Filed Large load 1.8 mi
CMH050 Built Large load 1.9 mi
CyrusOne COL-1 Filed Large load 2.1 mi
South Site Data Center Energy Center Filed Large load 2.2 mi
CMH03 Filed Large load 2.3 mi
STACK NAL01B (New Albany data centre) Filed Large load 2.7 mi
Union Ridge Solar Under construction Solar 10.6 mi 108
Harvey Solar Permitted Solar 11.3 mi 350
COLOGIX Built Large load 13.2 mi

Sources FAA OE/AAA · EPA ICIS-Air · EIA-860M

Sources

Attribution