Show on map
Tulia — Power plant · Gas, reciprocating engine · City of TuliaTX Nazareth Solar — Solar · TX · 201 MW · 19.4 km awayHornet Solar II (TX) (Hybrid) — Solar + storage · TX · 401.5 MW · 19.6 km away
  • Combustion
  • Wind & solar
  • In development
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engine Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1949
Location
Swisher County, Texas
Operated by
City of TuliaSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
77 years since 1949

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
January 2004
Capacity retired
16.7 MW
Generators retired
9
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
10Natural Gas Internal Combustion Engine1.7 MWRetiredJanuary 2004
11Natural Gas Internal Combustion Engine4.8 MWRetiredJanuary 2004
12Natural Gas Internal Combustion Engine3 MWRetiredJanuary 2004
2Natural Gas Internal Combustion Engine0.4 MWRetiredJanuary 2004
5Natural Gas Internal Combustion Engine1 MWRetiredJanuary 2004
6Natural Gas Internal Combustion Engine1.1 MWRetiredJanuary 2004
7Natural Gas Internal Combustion Engine1.1 MWRetiredJanuary 2004
8Natural Gas Internal Combustion Engine1.8 MWRetiredJanuary 2004
9Natural Gas Internal Combustion Engine1.8 MWRetiredJanuary 2004

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Transmission lines within 25 km (10)
Connection points within 25 km (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 10, 11, 12, 2, 5, 6, 7, 8, 9 scheduled to retire, 16.7 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · OpenStreetMap · ERCOT · EIA-860M Preliminary Monthly Electric Generator Inventory

© OpenStreetMap contributors

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
TX Nazareth Solar Permitted Solar 19.4 km 201
Hornet Solar II (TX) (Hybrid) Contracted Solar + storage 19.6 km 401.5

Sources EIA-860M · ERCOT

Sources