Two Dot Wind Farm

Power plant · Wind

Key facts

Power plant · Windran 34% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2014
Net generation, 2025
28,792 MWh
Grid
100 kV to NorthWestern Energy LLC - (MT) (NWMT)
Location
Wheatland County, Montana
Operated by
NorthWestern Energy (MT wind/thermal)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2014 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
12 years since 2014
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000927374
Location id
L100000921973
Eia plant ids
59003
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
100
Transmission owner
NorthWestern Energy LLC - (MT)
Balancing authority code
NWMT
Balancing authority name
NorthWestern Energy (NWMT)
Fuel burned (MMBtu), 202598,240
Capacity factor, 20250.339
Net generation (MWh), 202528,792
Balancing authority codeNWMT

Wind turbines

Turbines
13
Turbine capacity (MW)
10.2
Turbine models
7 Nordtank 65kW and 6 GE Wind GE1.62-87
Hub height (m)
22.8–80
Rotor diameter (m)
16.5–87
Years online
2005–2014

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Martinsdale Wind Farm Postponed Wind 7.4 mi 80
New Colony Wind Project Postponed Wind 9.0 mi 23.1