Show on map
Upland — Power plant · Solar · Greenbacker Renewable Energy CorporationSolar Carver 3 Hybrid — Under construction · Solar + storage · MA · 2 MW · 13.7 km awaySolar Carver 1 Hybrid — Under construction · Solar + storage · MA · 4 MW · 15.8 km awayLogging Swamp North — Permitted · Solar · MA · 5 MW · 22.4 km awayLogging Swamp South — Permitted · Solar · MA · 5 MW · 22.4 km awayBraley Hill North Solar — Under construction · Solar + storage · MA · 10 MW · 23.0 km awaySnipatuit Road Solar — Under construction · Solar + storage · MA · 8 MW · 23.1 km awayFeatherbed Lane South Solar — Under construction · Solar + storage · MA · 2 MW · 24.3 km away
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 5% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Net generation, 2025
3,301 MWh
Grid
23 kV to NSTAR Electric Company (ISNE)
Location
Plymouth County, Massachusetts
Operated by
Greenbacker Renewable Energy CorporationSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
1 year since 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001019357
Location id
L100001017370
Eia plant ids
67276
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
22.80
Transmission owner
NSTAR Electric Company
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 202511,263
Capacity factor, 20250.052
Net generation (MWh), 20253,301
Balancing authority codeISNE

Solar array

Array area (acres)
11.3
AC capacity (MW)
5
DC capacity (MW)
5
Site type
Greenfield
Began operating
2025

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Solar Carver 3 Hybrid Under construction Solar + storage 13.7 km 2
Solar Carver 1 Hybrid Under construction Solar + storage 15.8 km 4
Logging Swamp North Permitted Solar 22.4 km 5
Logging Swamp South Permitted Solar 22.4 km 5
Braley Hill North Solar Under construction Solar + storage 23.0 km 10
Snipatuit Road Solar Under construction Solar + storage 23.1 km 8
Featherbed Lane South Solar Under construction Solar + storage 24.3 km 2

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution