Upper Pacolet Hydro — Power plant · Hydro · Lockhart Power CoTurkey Hill Solar I — Postponed · Solar · SC · 2 MW · 3.3 mi awayVALARA HOLDINGS HIGH PERFORMANCE COMPUTE CENTER — Under construction · Large load · SC · 6.0 mi awayFairview Solar — Postponed · Solar · SC · 2 MW · 12.8 mi awayDavis Road Solar — Postponed · Solar · SC · 2 MW · 12.8 mi awayHighway 9 Solar — Postponed · Solar · SC · 2 MW · 13.7 mi away
  • Clean firm
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Upper Pacolet Hydro

Power plant · Hydro

Key facts

Power plant · Hydroran 49% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2013
Net generation, 2025
4,757 MWh
Grid
34 kV to Lockhart Power Co (DUK)
Location
Spartanburg County, South Carolina
Operated by
Lockhart Power CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2013 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
13 years since 2013
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
34.50
Transmission owner
Lockhart Power Co
Balancing authority code
DUK
Balancing authority name
Duke Energy Carolinas
Fuel burned (MMBtu), 202516,232
Capacity factor, 20250.494
Net generation (MWh), 20254,757
Balancing authority codeDUK

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Turkey Hill Solar I Postponed Solar 3.3 mi 2
VALARA HOLDINGS HIGH PERFORMANCE COMPUTE CENTER Under construction Large load 6.0 mi
Fairview Solar Postponed Solar 12.8 mi 2
Davis Road Solar Postponed Solar 12.8 mi 2
Highway 9 Solar Postponed Solar 13.7 mi 2

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution