Upton County BESS — Power plant · Storage · VESI Upton County BESS, LLCCrane 2 BESS 2 — Postponed · Storage · TX · 150 MW · 0.8 mi awayUpton BESS 2 — Postponed · Storage · TX · 150 MW · 1.5 mi awayMendoza Trail BESS — Under construction · Storage · TX · 200 MW · 3.2 mi awayMorada del Sol, LLC — Postponed · Solar · TX · 247 MW · 7.1 mi awayKing Mountain Solar — Under construction · Solar · TX · 175 MW · 11.7 mi away
  • Wind & solar
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Upton County BESS

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Net generation, 2025
-1,316 MWh
Grid
138 kV to Lower Colorado River Authority (ERCO)
Location
Upton County, Texas
Operated by
VESI Upton County BESS, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
3 years since 2023
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
Lower Colorado River Authority
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-1,316
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -1316.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Crane 2 BESS 2 Postponed Storage 0.8 mi 150
Upton BESS 2 Postponed Storage 1.5 mi 150
Mendoza Trail BESS Under construction Storage 3.2 mi 200
Morada del Sol, LLC Postponed Solar 7.1 mi 247
King Mountain Solar Under construction Solar 11.7 mi 175

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution