US Magnesium
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbine Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1972
- Net generation, 2025
- 0 MWh
- Grid
- 14 kV to PacifiCorp (PACE)
- Location
- Tooele County, Utah
- Operated by
- US Magnesium
Output
- Gas
- Oil
Details
Who’s behind it
- Owner
- The Renco Group Inc
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Age
- 54 years since 1972
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 1,476 |
| Net generation (MWh), 2025 | 0 |
| Balancing authority code | PACE |
Data notes (2)
- Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
- Heat rate (Btu/kWh), 2025 not shown: fuel burned but net generation is not positive
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- December 2025
- Capacity retired
- 48 MW
- Generators retired
- 3
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GT1 | Natural Gas Fired Combustion Turbine | 16 MW | Retired | December 2025 |
| GT2 | Natural Gas Fired Combustion Turbine | 16 MW | Retired | December 2025 |
| GT3 | Natural Gas Fired Combustion Turbine | 16 MW | Retired | December 2025 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 14 kV
- Transmission or distribution system owner
- PacifiCorp
- Balancing authority
- PacifiCorp - East
- NERC region
- WECC
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| US Magnesium | Operator | EIA-860M | ||
| THE RENCO GROUP INC | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Units GT1, GT2, GT3 scheduled to retire, 48 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| US Magnesium unit GT4 Postponed | Gas, combustion turbine | 0.0 mi | 30 |
Sources EIA-860M