Show on map
- Clean firm
- Wind & solar
- Loads
- In development
- Under construction
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Clean firm
- Wind & solar
- Loads
- In development
- Under construction
- Size not stated
- Other infrastructure
Utopia East: route and 11 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Utopia East
HGL pipeline
Key facts
HGL pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-MI, US-OH
- Operated by
- Kinder Morgan, Inc.SourceEIA US Energy Atlas — Hydrocarbon Gas Liquids (HGL) Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 200
- Units
- 1
All 5 attributes from EIA US Energy Atlas — Hydrocarbon Gas Liquids (HGL) Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 1 |
| Operator, as the source states it | KINDER MORGAN |
| Mapped segments | 1 |
| Source release | 202001 |
| Pipeline name raw | Utopia East |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Hydrocarbon Gas Liquids (HGL) Pipelines (line geometries, operator, pipeline name)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, HGL Pipelines (as of January 2020)
- EIA US Energy Atlas — Hydrocarbon Gas Liquids (HGL) Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Firelands Wind Under construction | Wind | 4.9 mi | 297 |
| Oppidan BG Data Center Filed | Large load | 6.6 mi | |
| Steubenville Solar Announced | Solar | 8.4 mi | 43 |
| Echelon Solar Postponed | Solar + storage | 8.8 mi | 160 |
| Beecher Solar Park Under construction | Solar | 11.7 mi | 80 |
| New Cumberland Hydroelectric Project Filed | Hydro | 13.3 mi | 20 |
| Wylie Ridge Solar Filed | Solar | 13.3 mi | 8.4 |
| Juliet Energy Project, LLC Under construction | Solar | 13.7 mi | 50 |
| Cadiz Power Plant Postponed | Gas, combined cycle | 13.9 mi | 1,320 |
| Stark Solar, LLC Announced | Solar | 13.9 mi | 150 |
| FDS Co-Generation Facility Postponed | Gas, other | 14.2 mi | 135 |
Sources EIA-860M · FAA OE/AAA