Show on map
V C Summer - Winnesboro 230 kV — Transmission lineV C Summer — Postponed · Nuclear · SC · 2,200 MW · 0.1 mi awaySCE&G IRMO DATA CENTER — Large load · SC · 13.6 mi awayIRMO DATA CENTER — Large load · SC · 13.8 mi away
  • Loads
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

V C Summer - Winnesboro 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-SC

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
14
Substations at the ends (as the source names them)
V C Summer to Winnesboro
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID121382
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
V C Summer Postponed Nuclear 0.1 mi 2,200
SCE&G IRMO DATA CENTER Unknown Large load 13.6 mi
IRMO DATA CENTER Unknown Large load 13.8 mi

Sources EIA-860M · EPA ICIS-NPDES

Sources

Attribution