V H Braunig

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 7% of 2025 Out of service
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1966
Net generation, 2025
650,671 MWh
Grid
138 kV to City of San Antonio - (TX) (ERCO)
Location
Bexar County, Texas

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
60 years since 1966
Heat rate
10,738 Btu/kWh 2025
All 8 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
City of San Antonio - (TX)
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110008060873
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001104
Eia status
By code
OA
Mw
417
Units
1
OP
Mw
244
Units
4
OS
Mw
477
Units
2
Standby mw
0
Status rule
majority_mw_out_of_service
In service mw
1,138
Out of service mw
894
Fuel burned (MMBtu), 20256,987,198
Capacity factor, 20250.065
Heat rate (Btu/kWh), 202510,738.4
Net generation (MWh), 2025650,671.0
Balancing authority codeERCO

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
City of San Antonio - (TX) Operator EIA-860M
CPS Energy Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Padua 3 Under construction Storage 9.4 km 200
Rush ESS Studied Storage 10.1 km 201.3
Alamo City ESS Contracted Storage 11.6 km 128.2
El Patrimonio Contracted Solar 12.5 km 152.3