Show on map
Valencia 2 — Power plant · Solar · Greenbacker Renewable Energy CorporationCE&P Imperial Valley 1 — Permitted · Other · CA · 50 MW · 7.5 mi awayBlack Rock I — Postponed · Geothermal · CA · 70 MW · 10.8 mi awayBlack Rock II — Postponed · Geothermal · CA · 70 MW · 10.8 mi awayBlack Rock III — Postponed · Geothermal · CA · 70 MW · 10.8 mi awayHudson Ranch Power II LLC — Postponed · Geothermal · CA · 55 MW · 12.7 mi away
  • Wind & solar
  • Unspecified fuel
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 29% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
7,619 MWh
Grid
34 kV to Imperial Irrigation District (IID)
Location
Imperial County, California
Operated by
Greenbacker Renewable Energy CorporationSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2020 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
6 years since 2020
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000818391
Location id
L100000815522
Eia plant ids
64267
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
34.50
Transmission owner
Imperial Irrigation District
Balancing authority code
IID
Balancing authority name
Imperial Irrigation District
Fuel burned (MMBtu), 202525,996
Capacity factor, 20250.290
Net generation (MWh), 20257,619
Balancing authority codeIID

Solar array

Array area (acres)
11.5
AC capacity (MW)
3
DC capacity (MW)
4.2
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2020

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CE&P Imperial Valley 1 Permitted Other 7.5 mi 50
Black Rock I Postponed Geothermal 10.8 mi 70
Black Rock II Postponed Geothermal 10.8 mi 70
Black Rock III Postponed Geothermal 10.8 mi 70
Hudson Ranch Power II LLC Postponed Geothermal 12.7 mi 55

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution