Show on map
Valenite — Power plant · Oil · Central Electric PowerTarpon Solar I — Solar · SC · 2 MW · 25.0 km away
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2003
Net generation, 2025
105 MWh
Grid
12 kV to Blue Ridge Electric Coop Inc - (SC) (DUK)
Location
Oconee County, South Carolina
Operated by
Central Electric PowerSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2003 to 2025
Fuel burned MMBtu by year, 2003 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
23 years since 2003
Unused energy
25 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
9,486 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Blue Ridge Electric Coop Inc - (SC)
Balancing authority code
DUK
Balancing authority name
Duke Energy Carolinas
Fuel burned (MMBtu), 2025996
Capacity factor, 20250.004
Heat rate (Btu/kWh), 20259,485.7
Net generation (MWh), 2025105
Balancing authority codeDUK

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Tarpon Solar I Postponed Solar 25.0 km 2

Sources EIA-860M