Show on map
Valero Refinery Corpus Christi East — Power plant · Gas, combustion turbine · Valero Refining CoM&G Resins USA — Under construction · Other · TX · 28.6 MW · 3.6 mi awayCumbia Energy Center — Announced · Storage · TX · 200 MW · 5.0 mi awayBEACON POINT DATA CENTER PROJECT — Under construction · Large load · TX · 10.8 mi away
  • Combustion
  • Storage
  • Unspecified fuel
  • Loads
  • In development
  • Under construction
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Valero Refinery Corpus Christi East

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 13% of 2009 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1984
Net generation, 2009
46,591 MWh
Grid
138 kV to AEP Texas Central Company (ERCO)
Location
Nueces County, Texas
Operated by
Valero Refining CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2010
Fuel burned MMBtu by year, 2001 to 2010
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
42 years since 1984
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeERCO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
July 2010
Capacity retired
40 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Natural Gas Fired Combustion Turbine20 MWRetiredJuly 2010
GEN2Natural Gas Fired Combustion Turbine20 MWRetiredJuly 2010

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
138 kV
Transmission or distribution system owner
AEP Texas Central Company
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units GEN1, GEN2 scheduled to retire, 40 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · OpenStreetMap · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

© OpenStreetMap contributors

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
M&G Resins USA Under construction Other 3.6 mi 28.6
Cumbia Energy Center Announced Storage 5.0 mi 200
BEACON POINT DATA CENTER PROJECT Under construction Large load 10.8 mi

Sources EIA-860M · EPA ICIS-NPDES

Sources

Attribution