Show on map
Cumbia Energy CenterM&G Resins USA — Under construction · Other · TX · 28.6 MW · 7.1 mi awayBEACON POINT DATA CENTER PROJECT — Under construction · Large load · TX · 12.2 mi away
  • Storage
  • Unspecified fuel
  • Loads
  • In development
  • Under construction
  • Size not stated
  • 10 · 100 · 1,000 MW

Cumbia Energy Center

Storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
In-service date
(stated)
Location
Nueces County, Texas

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Storage source: “Batteries”
EIA plant
67768 generator CECBA

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as announced in EIA-860M (source status: “(P) Planned for installation, but regulatory approvals not initiated”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
M&G Resins USA Under construction Other 7.1 mi 28.6
BEACON POINT DATA CENTER PROJECT Under construction Large load 12.2 mi

Sources EIA-860M · EPA ICIS-NPDES

Sources

Attribution