Vanderbilt University Power Plant: location and 5 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Vanderbilt University Power Plant
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbineran 65% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2002
- Net generation, 2025
- 105,673 MWh
- Grid
- 15 kV to Nashville Electric Service (TVA)
- Location
- Davidson County, Tennessee
- Operated by
- The Vanderbilt UniversitySourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Coal
Details
Who’s behind it
- Owner
- The Vanderbilt UniversitySource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023
Interested in this project?
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Age
- 24 years since 2002
- Unused energy
- 58 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 10,865 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 1,148,092 |
| Capacity factor, 2025 | 0.645 |
| Heat rate (Btu/kWh), 2025 | 10,864.6 |
| Net generation (MWh), 2025 | 105,673 |
| Balancing authority code | TVA |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 16.2 MW
- Generators retired
- 3
- Capacity still in service
- 18.7 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN2 | Conventional Steam Coal | 4.5 MW | Retired | March 2014 |
| GEN1 | Conventional Steam Coal | 6.5 MW | Retired | November 2014 |
| GT1 | Natural Gas Fired Combustion Turbine | 5.2 MW | Retired | March 2016 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Conventional Steam Coal | 11 MW | |
| Natural Gas Fired Combustion Turbine | 5.2 MW |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 15 kV
- Transmission or distribution system owner
- Nashville Electric Service
- Balancing authority
- Tennessee Valley Authority
- NERC region
- SERC
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit GT1 scheduled to retire, 5.2 MW · EIA-860M
- Stated Unit GEN1 scheduled to retire, 6.5 MW · EIA-860M
- Stated Unit GEN2 scheduled to retire, 4.5 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| H5 FUND VII, LLC Built | Large load | 1.9 mi | |
| EDGECONNEX INC. (EDCNAS01) Built | Large load | 5.6 mi | |
| OPTUM Built | Large load | 9.3 mi | |
| HCA IT&S Built | Large load | 11.9 mi | |
| FLEXENTIAL CORP. Built | Large load | 13.6 mi |
Sources EPA ICIS-Air