Vanderbilt University Power Plant — Power plant · Gas, combustion turbine · THE VANDERBILT UNIVERSITY
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Vanderbilt University Power Plant

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 65% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2002
Net generation, 2025
105,673 MWh
Grid
15 kV to Nashville Electric Service (TVA)
Location
Davidson County, Tennessee
Operated by
The Vanderbilt UniversitySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2025
105,673MWh
Fuel burned, 2025
1,148,092MMBtu
Capacity factor, 2025
64.5%
Heat rate, 2025
10,865Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
2025105,6731,148,09264.5%10,865
2024103,82211,470,82463.2%—
202394,2941,046,54457.6%11,099
2022101,0551,198,82861.7%11,863
2021103,3831,142,16563.1%11,048
2020108,9311,292,86766.3%11,869
2019110,5651,367,51667.5%12,368
2018120,3381,526,06073.5%12,681
201792,7261,188,71856.6%12,820
201686,3741,086,03352.6%12,574
201547,661721,61729.1%15,141
201428,4081,416,73717.3%—
201386,2362,173,63752.6%25,206
201270,5382,184,53742.9%—
201167,6012,118,98441.3%—
201068,0062,293,70341.5%—
200963,4412,360,95038.7%—
200841,1252,138,90325.0%—
200781,7161,828,36449.9%22,374
200668,2681,606,28141.7%23,529
2005 (11 of 12 months)70,0581,605,121—22,911
2004 (9 of 12 months)55,8491,428,700—25,582
200370,7492,081,28443.2%29,418
200238,7921,487,07323.7%—
200149,7681,649,92030.4%—
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 27, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)