Vaquero — Power plant · Oil · Power Depot Group A, LLCAegle Power — Studied · Gas, combined cycle · TX · 1,536.4 MW · 3.7 mi awayHarlingen #1 BESS 1 — Under construction · Storage · TX · 10 MW · 4.3 mi awayProposed Digital Infrastructure Facility (Harlingen data centre) — Filed · Large load · TX · 4.9 mi awayArroyo Storage — Under construction · Solar + storage · TX · 283.8 MW · 7.2 mi awayHarryoung PV and BESS — Studied · Solar + storage · TX · 380 MW · 7.6 mi awayTX18 Cottage Meadow Storage — Postponed · Storage · TX · 100 MW · 8.0 mi awayMFE-A-KATI 2 DATA CENTER DEVELOPMENT — Under construction · Large load · TX · 11.3 mi awayMesquite Clean Energy Center (BESS) — Under construction · Storage · TX · 10.1 MW · 11.5 mi awayAccalia Point Solar, LLC — Studied · Solar · TX · 190.5 MW · 12.4 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2013
Net generation, 2025
120 MWh
Grid
138 kV to AEP Texas Central Company (ERCO)
Location
Cameron County, Texas
Operated by
Power Depot Group A, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2022 to 2025
Fuel burned MMBtu by year, 2022 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
13 years since 2013
Unused energy
79 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
10,133 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
AEP Texas Central Company
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20251,216
Capacity factor, 20250.002
Heat rate (Btu/kWh), 202510,133.3
Net generation (MWh), 2025120
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Aegle Power Studied Gas, combined cycle 3.7 mi 1,536.4
Harlingen #1 BESS 1 Under construction Storage 4.3 mi 10
Proposed Digital Infrastructure Facility (Harlingen data centre) Filed Large load 4.9 mi
Arroyo Storage Under construction Solar + storage 7.2 mi 283.8
Harryoung PV and BESS Studied Solar + storage 7.6 mi 380
TX18 Cottage Meadow Storage Postponed Storage 8.0 mi 100
MFE-A-KATI 2 DATA CENTER DEVELOPMENT Under construction Large load 11.3 mi
Mesquite Clean Energy Center (BESS) Under construction Storage 11.5 mi 10.1
Accalia Point Solar, LLC Studied Solar 12.4 mi 190.5

Sources EIA-860M · ERCOT · FAA OE/AAA · EPA ICIS-NPDES

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 9, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026

Attribution