Show on map
Vergennes - Gaines 345 kV — Transmission lineMI GRR, LLC — Built · Large load · MI · 2.5 mi awayHastings Generating Facility — Permitted · Biomass · MI · 1.6 MW · 12.6 mi awayTupper Lake Wind — Filed · Wind · MI · 200 MW · 14.5 mi away
  • Wind & solar
  • Bioenergy
  • Loads
  • In development
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Vergennes - Gaines 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-MI
Owner (as stated)
Consumers Energy

Details

Who’s behind it

Owner
Consumers Energy

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
19
Substations at the ends (as the source names them)
Vergennes to Gaines
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itconsumers energy
HIFLD line ID131901
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
MI GRR, LLC Built Large load 2.5 mi
Hastings Generating Facility Permitted Biomass 12.6 mi 1.6
Tupper Lake Wind Filed Wind 14.5 mi 200

Sources EPA ICIS-Air · EIA-860M

Sources

Attribution