Show on map
Vernon — Power plant · Oil · AEP Texas North CompanyVernon Solar and Storage — Solar + storage · TX · 142 MW · 4.2 km awayHutcherson Solar — Solar · TX · 123.3 MW · 12.4 km awayProject Quantum Rise (Oklaunion data centre) — Large load · TX · 17.4 km away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oil Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1952
Net generation, 2004
0 MWh
Location
Wilbarger County, Texas
Operated by
AEP Texas North CompanySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2004
Fuel burned MMBtu by year, 2001 to 2004
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
74 years since 1952

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2006
Capacity retired
11.1 MW
Generators retired
5
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Petroleum Liquids2.4 MWRetiredDecember 2006
2Petroleum Liquids1.3 MWRetiredDecember 2006
3Petroleum Liquids2 MWRetiredDecember 2006
4Petroleum Liquids4.1 MWRetiredDecember 2006
7Petroleum Liquids1.3 MWRetiredDecember 2006

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 2, 3, 4, 7 scheduled to retire, 11.1 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · OpenStreetMap · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

© OpenStreetMap contributors

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Vernon Solar and Storage Postponed Solar + storage 4.2 km 142
Hutcherson Solar Announced Solar 12.4 km 123.3
Project Quantum Rise (Oklaunion data centre) Filed Large load 17.4 km