Power plant · Other
Key facts
Power plant · Otherran 12% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2016
- Net generation, 2025
- 9,621 MWh
- Grid
- 34 kV to PacifiCorp (PACE)
- Location
- Washington County, Utah
- Operated by
- Utah Associated Mun Power SysSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 9,621
MWh - Fuel burned, 2025
- 32,828
MMBtu - Capacity factor, 2025
- 11.6
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 9,621 | 32,828 | 11.6% | — |
| 2024 | 38,961 | 132,933 | 46.7% | — |
| 2023 | 45,761 | 156,137 | 55.0% | — |
| 2022 | 48,284 | 164,745 | 58.0% | — |
| 2021 | 31,715 | 280,488 | 38.1% | — |
| 2020 | 53,205 | 466,451 | 63.8% | — |
| 2019 | 48,865 | 435,143 | 58.7% | — |
| 2018 | 53,104 | 483,459 | 63.8% | — |
| 2017 | 52,917 | 487,525 | 63.6% | — |
| 2016 (8 of 12 months) | 36,108 | 333,350 | — | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.