Show on map
VPPSA Project 10 — Power plant · Oil · Vermont Public Power Supply Authority
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

VPPSA Project 10

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2010
Net generation, 2025
1,250 MWh
Grid
46 kV to Village of Swanton - (VT) (ISNE)
Location
Franklin County, Vermont
Operated by
Vermont Public Power Supply AuthoritySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2019 to 2025
Fuel burned MMBtu by year, 2019 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
16 years since 2010
Unused energy
412 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
17,851 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
46
Transmission owner
Village of Swanton - (VT)
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 202522,314
Capacity factor, 20250.003
Heat rate (Btu/kWh), 202517,851.2
Net generation (MWh), 20251,250
Balancing authority codeISNE

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source