Show on map
VS RXI Mason-Chatsworth, LLC — Power plant · Solar · TRITEC Americas20525 Nordhoff PV (North) — Under construction · Solar · CA · 1.9 MW · 0.1 mi awayAB Van Nuys — Announced · Solar · CA · 1.6 MW · 5.9 mi awayVan Norman Bypass Solar Project — Postponed · Solar · CA · 2 MW · 6.8 mi awayLas Virgenes MWD - Composting Plant — Under construction · Solar + storage · CA · 1.4 MW · 10.1 mi awayHumidor Storage I — Contracted · Storage · CA · 300 MW · 10.6 mi awaySix Flags Magic Mountain — Under construction · Solar + storage · CA · 12 MW · 13.4 mi awayFoothill Solar Project — Postponed · Solar · CA · 1.1 MW · 13.6 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

VS RXI Mason-Chatsworth, LLC

Power plant · Solar

Key facts

Power plant · Solarran 19% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Net generation, 2025
2,936 MWh
Grid
35 kV to Southern California Edison Co (LDWP)
Location
Los Angeles County, California
Operated by
TRITEC AmericasSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
3 years since 2023
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001058804
Location id
L100001051033
Eia plant ids
68409
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
35.40
Transmission owner
Southern California Edison Co
Balancing authority code
LDWP
Balancing authority name
Los Angeles Department of Water and Power
Fuel burned (MMBtu), 202510,019
Capacity factor, 20250.186
Net generation (MWh), 20252,936.3
Balancing authority codeLDWP

Solar array

Array area (acres)
6
AC capacity (MW)
1.8
DC capacity (MW)
2.3
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2023

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
20525 Nordhoff PV (North) Under construction Solar 0.1 mi 1.9
AB Van Nuys Announced Solar 5.9 mi 1.6
Van Norman Bypass Solar Project Postponed Solar 6.8 mi 2
Las Virgenes MWD - Composting Plant Under construction Solar + storage 10.1 mi 1.4
Humidor Storage I Contracted Storage 10.6 mi 300
Six Flags Magic Mountain Under construction Solar + storage 13.4 mi 12
Foothill Solar Project Postponed Solar 13.6 mi 1.1

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 16, 2026Source: California ISO

Attribution