W B Tuttle — Power plant · Gas, steam turbine · City of San Antonio - (TX)Alamo 3 BESS 2 — Postponed · Storage · TX · 100 MW · 12.0 mi awayUTSA TEP II — Postponed · Oil · TX · 3 MW · 12.6 mi awayAlamo City ESS — Contracted · Storage · TX · 128.2 MW · 14.1 mi awayAMAZON WEB SERVICE DATA CENTER — Built · Large load · TX · 14.3 mi awayEX WEST GREEN DATA CENTER — Built · Large load · TX · 14.8 mi away
  • Combustion
  • Storage
  • Loads
  • In development
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 0% of 2009 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1954
Net generation, 2009
5,466 MWh
Grid
138 kV to San Antonio City of (ERCO)
Location
Bexar County, Texas
Operated by
City of San Antonio - (TX)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2011
Fuel burned MMBtu by year, 2001 to 2011
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
72 years since 1954
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeERCO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
March 2011
First unit retired
October 2007
Capacity retired
493.9 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
2Natural Gas Steam Turbine113.6 MWRetiredOctober 2007
1Natural Gas Steam Turbine75 MWRetiredMarch 2011
3Natural Gas Steam Turbine113.6 MWRetiredMarch 2011
4Natural Gas Steam Turbine191.7 MWRetiredMarch 2011

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
138 kV
Transmission or distribution system owner
San Antonio City of
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
Transmission lines within 15 mi (10)
Connection points within 15 mi (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 3, 4 scheduled to retire, 380.3 MW · EIA-860M
  • Stated Unit 2 scheduled to retire, 113.6 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · OpenStreetMap · ERCOT · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

© OpenStreetMap contributors

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Alamo 3 BESS 2 Postponed Storage 12.0 mi 100
UTSA TEP II Postponed Oil 12.6 mi 3
Alamo City ESS Contracted Storage 14.1 mi 128.2
AMAZON WEB SERVICE DATA CENTER Built Large load 14.3 mi
EX WEST GREEN DATA CENTER Built Large load 14.8 mi

Sources EIA-860M · ERCOT · EPA ICIS-NPDES

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026

Attribution