Show on map
Wabuska — Power plant · Geothermal · Homestretch Geothermal LLC
  • Clean firm
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Geothermal

Key facts

Power plant · Geothermal Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1984
Net generation, 2018
0 MWh
Location
Lyon County, Nevada
Operated by
Homestretch Geothermal LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2003 to 2018

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Geothermal source: “Geothermal”
Age
42 years since 1984
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeNEVP

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2018
Capacity retired
5.4 MW
Generators retired
7
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Geothermal0.6 MWRetiredDecember 2018
2Geothermal0.8 MWRetiredDecember 2018
3Geothermal0.8 MWRetiredDecember 2018
4Geothermal0.8 MWRetiredDecember 2018
5Geothermal0.8 MWRetiredDecember 2018
6Geothermal0.8 MWRetiredDecember 2018
7Geothermal0.8 MWRetiredDecember 2018

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
NEVP
Transmission lines within 25 km (3)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 2, 3, 4, 5, 6, 7 scheduled to retire, 5.4 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source