Show on map
Wagyu — Power plant · Solar · Cubico USA, LLCElio Energy LLC — Contracted · Storage · TX · 205.3 MW · 2.7 km awayNash Solar — Under construction · Solar · TX · 10 MW · 6.2 km awayCastor — Under construction · Storage · TX · 200 MW · 10.3 km awayBrazos River BESS LLC — Contracted · Storage · TX · 180.4 MW · 10.8 km awaySecond Division Solar — Studied · Storage · TX · 30 MW · 11.4 km awayBell Creek BESS LLC — Contracted · Storage · TX · 200.9 MW · 11.7 km awayRock Rose Energy Storage — Under construction · Storage · TX · 208.5 MW · 18.6 km awayWindmill Ridge Storage — Postponed · Storage · TX · 151.4 MW · 19.8 km awayWittig Solar Park — Permitted · Solar · TX · 106.9 MW · 21.0 km awayMyrtle Solar, LLC — Under construction · Solar · TX · 313 MW · 22.4 km awayCradle Solar — Postponed · Solar · TX · 225 MW · 23.2 km awayRock N' Roll — Studied · Solar + storage · TX · 358 MW · 23.8 km away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 22% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
235,421 MWh
Grid
138 kV to CenterPoint Energy (ERCO)
Location
Brazoria County, Texas
Operated by
Cubico USA, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2020 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
6 years since 2020
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000804968
Location id
L100000804318
Eia plant ids
63273
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
CenterPoint Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 2025803,258
Capacity factor, 20250.224
Net generation (MWh), 2025235,421
Balancing authority codeERCO

Solar arrays

Array area (acres)
692.3
AC capacity (MW)
120
DC capacity (MW)
162.4
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2020

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Elio Energy LLC Contracted Storage 2.7 km 205.3
Nash Solar Under construction Solar 6.2 km 10
Castor Under construction Storage 10.3 km 200
Brazos River BESS LLC Contracted Storage 10.8 km 180.4
Second Division Solar Studied Storage 11.4 km 30
Bell Creek BESS LLC Contracted Storage 11.7 km 200.9
Rock Rose Energy Storage Under construction Storage 18.6 km 208.5
Windmill Ridge Storage Postponed Storage 19.8 km 151.4
Wittig Solar Park Permitted Solar 21.0 km 106.9
Myrtle Solar, LLC Under construction Solar 22.4 km 313
Cradle Solar Postponed Solar 23.2 km 225
Rock N' Roll Studied Solar + storage 23.8 km 358

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution