Show on map
Waiau - Koolau 138 kV — Transmission lineAES Waiawa Phase 2 Solar — Under construction · Solar + storage · HI · 60 MW · 2.2 mi awayPuuloa Energy — Announced · Biomass · HI · 103.4 MW · 2.9 mi awayPuuloa Solar — Announced · Solar + storage · HI · 12.4 MW · 3.4 mi awayKupehau — Postponed · Solar + storage · HI · 120 MW · 5.1 mi awayEKS Solar Farm — Postponed · Solar · HI · 5 MW · 6.8 mi awayLILIUOKALANI ELEMENTARY SCHOOL - RELOCATION OF VARIOUS DOE PROGRAMS (DATA CENTER — Large load · HI · 7.0 mi awayBarbers Point Solar, LLC — Postponed · Solar + storage · HI · 30 MW · 7.1 mi awayKalaeloa Solar One — Postponed · Solar · HI · 6 MW · 9.2 mi awayKalaeloa Home Lands Solar — Under construction · Solar · HI · 1.7 MW · 9.7 mi awayAES Mountain View Solar — Under construction · Solar + storage · HI · 14 MW · 14.5 mi away
  • Wind & solar
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Waiau - Koolau 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-HI
Owner (as stated)
Hawaiian Electric

Details

Who’s behind it

Owner
Hawaiian Electric

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
13
Substations at the ends (as the source names them)
Waiau to Koolau
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states ithawaiian electric
HIFLD line ID157877
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
AES Waiawa Phase 2 Solar Under construction Solar + storage 2.2 mi 60
Puuloa Energy Announced Biomass 2.9 mi 103.4
Puuloa Solar Announced Solar + storage 3.4 mi 12.4
Kupehau Postponed Solar + storage 5.1 mi 120
EKS Solar Farm Postponed Solar 6.8 mi 5
LILIUOKALANI ELEMENTARY SCHOOL - RELOCATION OF VARIOUS DOE PROGRAMS (DATA CENTER Unknown Large load 7.0 mi
Barbers Point Solar, LLC Postponed Solar + storage 7.1 mi 30
Kalaeloa Solar One Postponed Solar 9.2 mi 6
Kalaeloa Home Lands Solar Under construction Solar 9.7 mi 1.7
AES Mountain View Solar Under construction Solar + storage 14.5 mi 14

Sources EIA-860M · EPA ICIS-NPDES

Sources

Attribution