Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 2% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2021
- Net generation, 2025
- 257 MWh
- Grid
- 0.5 kV to Oncor Electric Delivery Company LLC (ERCO)
- Location
- Scurry County, Texas
- Operated by
- Walmart Stores Texas, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 257
MWh - Fuel burned, 2025
- 2,571
MMBtu - Capacity factor, 2025
- 2.4
% - Heat rate, 2025
- 10,004
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 257 | 2,571 | 2.4% | 10,004 |
| 2024 | 176 | 2,094 | 1.7% | 11,898 |
| 2023 | 287 | 4,031 | 2.7% | 14,045 |
| 2022 | 226 | 3,175 | 2.1% | 14,049 |
| 2021 (9 of 12 months) | 126 | 1,773 | — | 14,071 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.