- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
WAL284: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
WAL284
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 4% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2021
- Net generation, 2025
- 372 MWh
- Grid
- 0.5 kV to Oncor Electric Delivery Company LLC (ERCO)
- Location
- Tarrant County, Texas
- Operated by
- Walmart Stores Texas, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 372
MWh - Fuel burned, 2025
- 3,722
MMBtu - Capacity factor, 2025
- 3.5
% - Heat rate, 2025
- 10,005
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 372 | 3,722 | 3.5% | 10,005 |
| 2024 | 217 | 3,197 | 2.1% | 14,733 |
| 2023 | 356 | 5,132 | 3.4% | 14,416 |
| 2022 | 286 | 4,129 | 2.7% | 14,437 |
| 2021 (3 of 12 months) | 11 | 151 | — | 13,727 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.