WAL2883 — Power plant · Gas, reciprocating engine · Walmart Stores Texas, LLCALIGNED DATA CENTER MEMORY TECH PHASE 1 ADDITION — Large load · TX · 15.1 km awayFLEXENTIAL DATA CENTER EXPANSION — Large load · TX · 15.8 km awayEDGECORE DATACENTER - FUJITSU CAMPUS ADDITION — Large load · TX · 17.4 km awayBANK OF AMERICA - RTX MODULAR DATA CENTER — Large load · TX · 18.2 km awayRAGINGWIRE DATA CENTER — Large load · TX · 18.4 km awaySDC DFW-VII DATA CENTER PHASE 2 — Large load · TX · 18.5 km awayNTT TX-4 DATA CENTER — Large load · TX · 18.5 km awayCrane DLR37 (Garland data centre) — Large load · TX · 19.1 km away2501 Edmonds Ln Lewisville TX Data Center — Large load · TX · 21.9 km away
  • Combustion
  • Loads
  • In development
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 4% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
388 MWh
Grid
0.5 kV to Oncor Electric Delivery Company LLC (ERCO)
Location
Collin County, Texas
Operated by
Walmart Stores Texas, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2025
Fuel burned MMBtu by year, 2021 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
5 years since 2021
Unused energy
10 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
9,997 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
0.500
Transmission owner
Oncor Electric Delivery Company LLC
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20253,879
Capacity factor, 20250.037
Heat rate (Btu/kWh), 20259,997.4
Net generation (MWh), 2025388
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
ALIGNED DATA CENTER MEMORY TECH PHASE 1 ADDITION Built Large load 15.1 km
FLEXENTIAL DATA CENTER EXPANSION Built Large load 15.8 km
EDGECORE DATACENTER - FUJITSU CAMPUS ADDITION Unknown Large load 17.4 km
BANK OF AMERICA - RTX MODULAR DATA CENTER Built Large load 18.2 km
RAGINGWIRE DATA CENTER Built Large load 18.4 km
SDC DFW-VII DATA CENTER PHASE 2 Built Large load 18.5 km
NTT TX-4 DATA CENTER Under construction Large load 18.5 km
Crane DLR37 (Garland data centre) Filed Large load 19.1 km
2501 Edmonds Ln Lewisville TX Data Center Filed Large load 21.9 km