Show on map
WAL3390 — Power plant · Gas, reciprocating engine · Walmart Stores Texas, LLCJohn Paul Jones — Gas, reciprocating engine · TX · 18.7 MW · 11.1 km awaySMT DC Houston 1 (Tomball data centre) — Large load · TX · 11.4 km awaySERVERFARM LONGHORN — Large load · TX · 21.7 km awayRatcliff Solar Park — Solar · TX · 85.7 MW · 22.0 km away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 4% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
384 MWh
Grid
0.5 kV to CenterPoint Energy (ERCO)
Location
Montgomery County, Texas
Operated by
Walmart Stores Texas, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2025
Fuel burned MMBtu by year, 2021 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
6 years since 2020
Unused energy
10 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
10,013 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
0.500
Transmission owner
CenterPoint Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20253,845
Capacity factor, 20250.036
Heat rate (Btu/kWh), 202510,013
Net generation (MWh), 2025384
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
John Paul Jones Postponed Gas, reciprocating engine 11.1 km 18.7
SMT DC Houston 1 (Tomball data centre) Filed Large load 11.4 km
SERVERFARM LONGHORN Under construction Large load 21.7 km
Ratcliff Solar Park Permitted Solar 22.0 km 85.7