Show on map
WAL3510 — Power plant · Gas, reciprocating engine · Walmart Stores Texas, LLCBocanova Energy Storage II — Storage · TX · 150 MW · 12.4 km awayBerkman Storage — Storage · TX · 100 MW · 15.7 km awayTexas Petrochemicals — Gas, combined cycle · TX · 560 MW · 17.0 km awayHidden Lakes — Storage · TX · 9.9 MW · 20.5 km awayNET Power La Porte Station — Gas, combustion turbine · TX · 25.5 MW · 20.8 km awayTX LaPort 10060 Porter Road Solar — Solar · TX · 1.6 MW · 22.8 km awayPamela Heights I Energy Center — Storage · TX · 101.7 MW · 23.5 km awayCallisto II Energy Center — Storage · TX · 303.2 MW · 23.5 km away
  • Combustion
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 1% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2019
Net generation, 2025
79 MWh
Grid
0.5 kV to CenterPoint Energy (ERCO)
Location
Brazoria County, Texas
Operated by
Walmart Stores Texas, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2025
Fuel burned MMBtu by year, 2021 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
7 years since 2019
Unused energy
11 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
9,582 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
0.500
Transmission owner
CenterPoint Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 2025757
Capacity factor, 20250.007
Heat rate (Btu/kWh), 20259,582.3
Net generation (MWh), 202579
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Bocanova Energy Storage II Under construction Storage 12.4 km 150
Berkman Storage Postponed Storage 15.7 km 100
Texas Petrochemicals Postponed Gas, combined cycle 17.0 km 560
Hidden Lakes Postponed Storage 20.5 km 9.9
NET Power La Porte Station Studied Gas, combustion turbine 20.8 km 25.5
TX LaPort 10060 Porter Road Solar Postponed Solar 22.8 km 1.6
Pamela Heights I Energy Center Under construction Storage 23.5 km 101.7
Callisto II Energy Center Under construction Storage 23.5 km 303.2

Sources EIA-860M · ERCOT

Sources

Attribution