WAL414
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 2% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2021
- Net generation, 2025
- 253 MWh
- Grid
- 0.5 kV to Oncor Electric Delivery Company LLC (ERCO)
- Location
- Wichita County, Texas
- Operated by
- Walmart Stores Texas, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 253
MWh - Fuel burned, 2025
- 2,528
MMBtu - Capacity factor, 2025
- 2.4
% - Heat rate, 2025
- 9,992
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 253 | 2,528 | 2.4% | 9,992 |
| 2024 | 153 | 2,402 | 1.5% | 15,699 |
| 2023 | 227 | 3,567 | 2.2% | 15,714 |
| 2022 | 176 | 2,768 | 1.7% | 15,727 |
| 2021 (9 of 12 months) | 106 | 1,498 | — | 14,132 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.