Show on map
WAL5311 — Power plant · Oil · Walmart Stores Texas, LLCALIGNED DATA CENTER MEMORY TECH PHASE 1 ADDITION — Large load · TX · 23.8 km awayFLEXENTIAL DATA CENTER EXPANSION — Large load · TX · 24.1 km away
  • Combustion
  • Loads
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 1% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
76 MWh
Grid
0.5 kV to Denton County Elec Coop, Inc (ERCO)
Location
Collin County, Texas
Operated by
Walmart Stores Texas, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2025
Fuel burned MMBtu by year, 2021 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
6 years since 2020
Unused energy
11 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
9,632 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
0.500
Transmission owner
Denton County Elec Coop, Inc
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 2025732
Capacity factor, 20250.007
Heat rate (Btu/kWh), 20259,631.6
Net generation (MWh), 202576
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
ALIGNED DATA CENTER MEMORY TECH PHASE 1 ADDITION Built Large load 23.8 km
FLEXENTIAL DATA CENTER EXPANSION Built Large load 24.1 km