WAL5316
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 4% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2020
- Net generation, 2025
- 377 MWh
- Grid
- 0.5 kV to Oncor Electric Delivery Company LLC (ERCO)
- Location
- Tarrant County, Texas
- Operated by
- Walmart Stores Texas, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 377
MWh - Fuel burned, 2025
- 3,769
MMBtu - Capacity factor, 2025
- 3.6
% - Heat rate, 2025
- 9,997
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 377 | 3,769 | 3.6% | 9,997 |
| 2024 | 236 | 3,449 | 2.2% | 14,614 |
| 2023 | 354 | 5,017 | 3.4% | 14,172 |
| 2022 | 300 | 4,252 | 2.9% | 14,173 |
| 2021 | 292 | 4,100 | 2.8% | 14,041 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.