- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
WAL896: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
WAL896
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 4% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2021
- Net generation, 2025
- 415 MWh
- Grid
- 0.5 kV to Oncor Electric Delivery Company LLC (ERCO)
- Location
- Dallas County, Texas
- Operated by
- Walmart Stores Texas, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 415
MWh - Fuel burned, 2025
- 4,152
MMBtu - Capacity factor, 2025
- 4.0
% - Heat rate, 2025
- 10,005
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 415 | 4,152 | 4.0% | 10,005 |
| 2024 | 240 | 3,004 | 2.3% | 12,517 |
| 2023 | 352 | 5,066 | 3.4% | 14,392 |
| 2022 | 301 | 4,336 | 2.9% | 14,405 |
| 2021 (3 of 12 months) | 34 | 603 | — | 17,735 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.