Show on map
Walnut — Power plant · Gas, combustion turbine · Turlock Irrigation DistrictAurora Renewable Energy (Hybrid) — Solar + storage · CA · 100 MW · 21.3 km away
  • Combustion
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbine Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1986
Net generation, 2025
-196 MWh
Grid
69 kV to Turlock Irrigation District (TIDC)
Location
Stanislaus County, California
Operated by
Turlock Irrigation DistrictSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Owner
Turlock Irrigation DistrictSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of 31 Dec 2023

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
40 years since 1986
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
69
Transmission owner
Turlock Irrigation District
Balancing authority code
TIDC
Balancing authority name
Turlock Irrigation District
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110043789157
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1003831
Fuel burned (MMBtu), 20259,497
Net generation (MWh), 2025-196
Balancing authority codeTIDC
Data notes (2)
  • Capacity factor, 2025 not shown: net generation -196.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
  • Heat rate (Btu/kWh), 2025 not shown: fuel burned but net generation is not positive

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Aurora Renewable Energy (Hybrid) Announced Solar + storage 21.3 km 100

Sources EIA-860M

Sources

Attribution