Wanapum
Power plant · Hydro
Key facts
Power plant · Hydroran 42% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2011
- Net generation, 2025
- 4,437,537 MWh
- Grid
- 230 kV to PUD No 2 of Grant County (GCPD)
- Location
- Grant County, Washington
- Operated by
- PUD No 2 of Grant County - (WA)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Hydro source: “Conventional Hydroelectric”
- Age
- 15 years since 2011
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Fuel burned (MMBtu), 2025 | 15,140,877 |
| Capacity factor, 2025 | 0.415 |
| Net generation (MWh), 2025 | 4,437,537 |
| Balancing authority code | GCPD |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 1,038 MW
- Generators retired
- 10
- Capacity still in service
- 1,220 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 7 | Conventional Hydroelectric | 103.8 MW | Retired | June 2010 |
| 5 | Conventional Hydroelectric | 103.8 MW | Retired | April 2011 |
| 2 | Conventional Hydroelectric | 103.8 MW | Retired | February 2012 |
| 1 | Conventional Hydroelectric | 103.8 MW | Retired | December 2012 |
| 10 | Conventional Hydroelectric | 103.8 MW | Retired | October 2013 |
| 9 | Conventional Hydroelectric | 103.8 MW | Retired | August 2014 |
| 6 | Conventional Hydroelectric | 103.8 MW | Retired | August 2015 |
| 3 | Conventional Hydroelectric | 103.8 MW | Retired | August 2016 |
| 8 | Conventional Hydroelectric | 103.8 MW | Retired | August 2017 |
| 4 | Conventional Hydroelectric | 103.8 MW | Retired | August 2019 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 230 kV
- Transmission or distribution system owner
- PUD No 2 of Grant County
- Balancing authority
- Public Utility District No. 2 of Grant County, Washington
- NERC region
- WECC
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 4 scheduled to retire, 103.8 MW · EIA-860M
- Stated Unit 8 scheduled to retire, 103.8 MW · EIA-860M
- Stated Unit 3 scheduled to retire, 103.8 MW · EIA-860M
- Stated Unit 6 scheduled to retire, 103.8 MW · EIA-860M
- Stated Unit 9 scheduled to retire, 103.8 MW · EIA-860M
- Stated Unit 10 scheduled to retire, 103.8 MW · EIA-860M
- Stated Unit 1 scheduled to retire, 103.8 MW · EIA-860M
- Stated Unit 2 scheduled to retire, 103.8 MW · EIA-860M
- Stated Unit 5 scheduled to retire, 103.8 MW · EIA-860M
- In service · EIA-860M
- Stated Unit 7 scheduled to retire, 103.8 MW · EIA-860M
Sources
4 sourcesSources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Royal Slope Permitted | Solar + storage | 2.4 mi | 520 |
Sources EIA-860M