Show on map
- Wind & solar
- Storage
- In development
- Operating
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Operating
- Other infrastructure
Warburton Stec Substation - Edna 138 kV: route and 6 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Warburton Stec Substation - Edna 138 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 138 kV
- States crossed
- US-TX
- Owner (as stated)
- AEP Texas
Details
Who’s behind it
- Owner
- AEP Texas
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 26
- Substations at the ends (as the source names them)
- Warburton Stec Substation to Edna
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | aep texas |
| HIFLD line ID | 302503 |
| Voltage class | 100-161 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Oriana Solar LLC Postponed | Storage | 6.6 mi | 61 |
| Goldenrod Creek Solar and BESS SLF Postponed | Solar + storage | 8.2 mi | 1,320 |
| Garcitas Creek Solar Postponed | Solar | 8.8 mi | 201.9 |
| Third Coast BESS, LLC Contracted | Storage | 9.0 mi | 102.8 |
| Dios BESS, LLC Contracted | Storage | 9.4 mi | 201.1 |
| New Hickory Solar Built | Solar | 13.5 mi | 209.2 |