Show on map
Wateree Station 230 kV line — Transmission lineRowesville Rd Plant — Postponed · Gas, combustion turbine · SC · 9.6 MW · 5.1 mi awayWSW Solar — Postponed · Solar · SC · 10.8 MW · 5.4 mi awaySR Cordova — Permitted · Solar · SC · 100 MW · 5.6 mi awayOrange County Biomass LLC — Postponed · Biomass · SC · 35 MW · 10.7 mi awayShining Sun Solar — Permitted · Solar · SC · 74 MW · 12.4 mi awayUlmer Solar — Postponed · Solar · SC · 22 MW · 13.4 mi away
  • Wind & solar
  • In development
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Wateree Station 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-SC
Owner (as stated)
Dominion Energy South Carolina

Details

Who’s behind it

Owner
Dominion Energy South Carolina

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
27
Substations at the ends (as the source names them)
Wateree Station
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itdominion energy south carolina
HIFLD line ID107409
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Rowesville Rd Plant Postponed Gas, combustion turbine 5.1 mi 9.6
WSW Solar Postponed Solar 5.4 mi 10.8
SR Cordova Permitted Solar 5.6 mi 100
Orange County Biomass LLC Postponed Biomass 10.7 mi 35
Shining Sun Solar Permitted Solar 12.4 mi 74
Ulmer Solar Postponed Solar 13.4 mi 22

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution